Wholesale 200pcs long leads yellow Axial Polyester Film Capacitors electronics 0.01uF 630V fr tube amp audio free shipping

59.75 $
This product is currently not available, see similar items
Go to store
This product is no longer for sale, see similar items
Link copied to clipboard, share it
Or send it to social networks
This item is not available right now, but there are same and similar

Price increased by 0.7 $

Higher than average, a bit

Reliable seller: 100%

You can safely buy here, Caryelectronics Store

  • More than 7 years of seller experience
  • High general feedback score (4659)
  • Customers are satisfied by communication
  • Items match description
  • High shipping speed
  • 0.9% of customers were dissatisfied over the last 3 months

Prices at other sellers from 1.51 $

45 similar items found

Free shipping JS-910B terminal 10pc/lot-16%
1.58 $

Free shipping js-910b terminal 10pc/lot

0decorative image
0decorative image
Seller reliability 89%
Wholesale 200pcs long leads yellow Axial Polyester Film Capacitors electronics 0.01uF 630V fr tube amp audio free shipping 2024 - buy cheap
Wholesale 200pcs long leads yellow Axial Polyester Film Capacitors electronics 0.01uF 630V fr tube amp audio free shipping 2024 - buy cheap
Wholesale 200pcs long leads yellow Axial Polyester Film Capacitors electronics 0.01uF 630V fr tube amp audio free shipping - compare prices
Wholesale 200pcs long leads yellow Axial Polyester Film Capacitors electronics 0.01uF 630V fr tube amp audio free shipping - specifications
Wholesale 200pcs long leads yellow Axial Polyester Film Capacitors electronics 0.01uF 630V fr tube amp audio free shipping - photo 2024
0decorative imageratings
0decorative imageorders

No photos from buyers yet

Product specifications

  • Extension Cable Length: None
  • Support Quick Charge: No
  • Synchronous Rectification Technology: No
  • Sub-control Switch: No
  • Overload Protection: No
  • USB Ports Number: None
  • Application: Residential / General-Purpose
  • Master Switch: No
  • Brand Name: Cayyi
  • Grounding: Non-Grounding
  • Rated Voltage: 110-250V
  • Surge Protector: No
  • Single USB Max Output: None
  • WIFI: No
  • Outlets Number: 1
  • Type: Other
Show all