Wholesale 100pcs long lead New Silver MICA Capacitors 5pF 500V for tube audio guitar amps tone DIY parts free shipping
This product is currently not available, see similar items
Go to store
This product is no longer for sale, see similar items
Link copied to clipboard, share itOr send it to social networks
This item is not available right now, but there are same and similar
Price increased by 0.88 $
Higher than average, a bitReliable seller: 100%
You can safely buy here, Caryelectronics Store
- More than 7 years of seller experience
- High general feedback score (4659)
- Customers are satisfied by communication
- Items match description
- High shipping speed
- 0.9% of customers were dissatisfied over the last 3 months
Prices at other sellers from 1.01 $
42 similar items found
-14%
2.06 $
Free shipping 3.5 stereo single channel plug-in audio plug 10pc/lot
0
0
Seller reliability 89%
-7%
27.65 $
Moonsaudio 4pcs rhodium plated carbon fiber hifi audio rca plug for rca cable
0
0
Seller reliability 100%
-2%
161.50 $
Free shipping 100pieces nakamichi gold plated spade plug for speaker cable
0
0
Seller reliability 100%
7.92 $
Hifi audio ac iec inlet female 24k gold plated for hifi amp chassis 1 pcs
4
1
Seller reliability 100%
26.60 $
2pcs high end 4pins tube socket 300b,2a3,811 vintage valve tube audio amp diy
0
1
Seller reliability 100%
-16%
1.58 $
Free shipping js-910b terminal 10pc/lot
0
0
Seller reliability 89%
0ratings
0orders
No photos from buyers yet
Product specifications
- Extension Cable Length: None
- Support Quick Charge: No
- Synchronous Rectification Technology: No
- Sub-control Switch: No
- Overload Protection: No
- USB Ports Number: None
- Application: Residential / General-Purpose
- Master Switch: No
- Brand Name: Cayyi
- Grounding: Non-Grounding
- Rated Voltage: 110-250V
- Surge Protector: No
- Single USB Max Output: None
- WIFI: No
- Outlets Number: 1
- Type: Other
Show all